Our Natural 4-Week Corten Steel Curing Process
Every COR10 number cures for 4 full weeks in seawater and direct sun before it ships. We apply seawater daily, we use zero chemical accelerants, and every piece arrives pre-weathered as standard.
We do not sell shortcuts. We do not recommend chemical sprays. This page shows exactly what happens to your number from the day you approve the drawing to the day it leaves Byron Bay.
STEP 01
It Starts With 3D Drawings for Client Approval
Every piece starts on screen before it touches steel. We prepare a 3D drawing of your custom number, lettering or sculpture and send it to you for approval.
Nothing gets cut until you sign off on the design. The drawing locks in the size, the font, the fixing points and the finish direction. This is where custom work either goes right or goes wrong, so we do not rush it.
STEP 02
Raw Weathering Steel After Welding, Ready for Curing
Once the drawing is approved, we cut and weld the piece. Fresh weathering steel looks grey or silver at this stage, and that surprises some buyers.
The grey colour is completely normal. It only means the patina has not started yet. The steel leaves the welding bench finished, cleaned and ready to begin the curing weathering process. What happens next is the part most sellers skip, and it is the whole reason our finish looks the way it does.
WEEKS 1–2
Weeks 1 and 2 Bring the Crusty Golden Patina
The piece goes outside into direct Byron Bay sun. We mist it with seawater every single day.
Within the first two weeks a crusty golden patina starts forming across the surface. The seawater and the sun do the work together through repeated wet and dry cycles. That cycling is what builds the dense oxide skin that makes weathering steel special, and rushing it with chemicals produces a weaker layer. We do not use chemical accelerants to speed up the weathering process, as a matter of policy.
Natural wet-and-dry cycling
Seawater and direct sun work together through repeated wet and dry cycles during the curing process.
Learn how the Corten patina actually works if you want the science behind the skin.
WEEK 03
Week 3 Builds the Protective Layer
By week three the patina is visibly consistent across the whole piece, front and back. The photo we share at this stage usually shows the back of a number, because the back proves the coverage is even.
Our process ensures a consistent overall golden patina that forms a protective layer against corrosion. That layer is what helps the number weather evenly for years after it is installed, instead of blotching or streaking. Consistency at week three is what prevents patchiness at year three.
WEEK 04
Week 4 Means Final Check and Dispatch
The fourth week finishes the cure. We inspect the piece in full daylight, checking for thin spots or uneven areas.
Only then does it get packed. The patina keeps maturing naturally after fitting, and it keeps maturing for years. What you receive is not the finished colour. It is a healthy young patina with its protective behaviour already established.
OUR APPROACH
Why We Avoid Chemical Accelerants
Chemical sprays exist, and we are often asked why we do not use them. Peroxide and vinegar mixes can force colour in hours, but the layer they build is thinner and less stable than one grown through real wet and dry cycling.
We avoid them for the same reason we weather every piece for the full four weeks. A number on the front of a house has to look good in ten years, not just on delivery day. The slow seawater cure is the method we trust, so it is the only method we use. That position also shapes our advice for coastal sites, where we tell customers plainly when Corten is not the right call.
We do not sell shortcuts. We use the slow seawater cure for the full four-week process.
DELIVERY
What Arrives at Your Door
Every number, letter set and sculpture arrives pre-weathered as standard. It is not an upgrade and it is not an optional extra.
You will see a golden rusty patina, darker in the recesses and warmer on the faces. Fresh steel can shed some rusty runoff in the first weeks outdoors, so keep new pieces off pale paving until the surface settles. After that the piece simply keeps maturing over time.
FAQ
Frequently Asked Questions
The four-week process is straightforward, but these are the questions we hear most often.
How long does your weathering process take?
Four weeks from the end of welding to dispatch. Seawater is applied daily in direct sun for the whole period. We do not shorten it.
Do you use chemicals to speed up the rust?
No. We use no chemical accelerants at any stage. Seawater and sun are the only inputs.
Will my number keep changing colour after I install it?
Yes, and that is normal. The patina keeps maturing naturally for years after fitting. The colour deepens and evens out rather than degrading.
Why does my new piece look patchy in the first weeks?
Early patina can look uneven up close while the oxide skin is still building. The four-week cure exists to get past the worst of that before dispatch. Give it a few months outdoors and it settles into a consistent finish.
Can I speed up the process myself after delivery?
We advise against chemical sprays on our pieces. They can interfere with the cured layer we built. If you want a darker finish faster, time and weather do it safely on their own.
SOURCES
Sources
SSAB weathering steel recommendations. The protective oxide skin forms through repeated wet and dry cycles, and the steel needs airflow and drainage on all surfaces.
MDPI Buildings, state-of-the-art review of weathering steel, 2025. Corrosion rates as low as 0.01 mm per year once the patina stabilises in suitable atmospheres.
Your Piece Is Weathered Before It Ships
Every COR10 number arrives pre-weathered as standard, using seawater and direct sun in Byron Bay over about four weeks. No chemicals. No DIY mess. Send us your size, shape and quantity for a full job quote.